As part of the Design Build Team we were the Prime Engineer that designed all mechanical, structural and electrical components of the project. We worked closely with the High Rate Anaerobic System Vendor to design the system to reduce BOD prior to their activated sludge package plant. We are able to work with vendors by integrating their supplied system components with other system components that need to be designed as part of the overall system and produce system PIDs, drawings and specifications for construction.